Construction

Status of work
On the 2nd floor, the installation of vertical elements and floor slabs has been completed. The vertical elements on the 3rd floor are 70% ready, the floor slab is 30% ready.




Construction

0%
0%

Facade

0%
0%

Landscaping

0%
0%

Networks

0%
0%
  • advantages
    27.01.2021
  • advantages
    22.01.2021
  • advantages
    14.01.2021
  • advantages
    30.12.2020
  • advantages
    23.12.2020
  • advantages
    16.12.2020
  • advantages
    10.12.2020
  • advantages
    03.12.2020

ORDER BACK CALL

* - required fields

Загрузить презентацию

* - required fields