Construction
Status of work
On the 2nd floor, the installation of vertical elements and floor slabs has been completed. The vertical elements on the 3rd floor are 70% ready, the floor slab is 30% ready.
Construction
0%
0%
Facade
0%
0%
Landscaping
0%
0%
Networks
0%
0%