Construction

Status of work
Piles are arranged along the axis of the construction site (100 piles out of 157 are arranged).




  • advantages
    15.01.2020
  • advantages
    09.01.2020
  • advantages
    22.11.2019
  • advantages
    21.10.2019
  • advantages
    11.09.2019
  • advantages
    04.09.2019

ORDER BACK CALL

* - required fields